Slovnaft refinery, Powerhouse, Slovakia 1993 - 2013
Foxboro I/A, Mesh - AW70, ZCP270, FCP270
Triconex ESD (Trident, Tricon)
Rockwell Automation, Control Logix, PLC5, SLC - RS Logic
HIMA ESD
Periodical maintenance and 24/7 oncall servis of Powerhouse Control System, Burner Management System and Boilers´ Trip System.
CMEPS (Slovnaft) Powerhouse, Slovakia, boilers K4/K5 2010 - 2013
Foxboro I/A - AW70, ZCP270
ESD Tricon
Full development and implementation of application for new boilers K4 and K5 (manufacturer SES Tlmace, 160 t/h, oil/natural gas/refinery gas) - control database, boiler ESD and Burner Management System programing (Tricon), HMI, 3rd party PLC Modbus communication (3x compressors, 1x ESP, 2x Sootblowers), startup.
CMEPS (Slovnaft) Powerhouse, Slovakia, turbogenerator TG5 2010 - 2013
Foxboro I/A - AW70, ZCP270
Development and implementation of application for new turbogenerator TG5 (manufacturer Škoda Power, 60 MW, extraction condensing turbine) - control database, HMI, Modbus communication to Woodward governor, startup.
CMEPS (Slovnaft) Powerhouse, Slovakia, cooling circuit CC8 2010 - 2013
Foxboro I/A - AW70, FCP27
Development and implementation of application for new cooling circuit CC8 (manufacturer FANS) - control database, HMI, Modbus communication to Simatics PLC (Filtration), startup.
CMEPS (Slovnaft) Powerhouse, Slovakia, Flue Gases Desulphurisation 2010 - 2012
Foxboro I/A - AW70, ZCP270
ESD Trident
Full development and implementation of application for new FGD plant - control database, ESD system programming (Trident), HMI, Modbus communication to Rockwell Automation PLCs (2x centrifuge, 2x silo), communication to B&K s vibration monitoring system, startup.
CMEPS (Slovnaft) Powerhouse, Slovakia, Wastewater treatment plant for FGD 2010 - 2012
Foxboro I/A - AW70, FCP270
Development and implementation of application for new FGD wastewater treatment plant - control database, HMI, Profibus communication to Simatic S200 PLCs, startup.
CMEPS (Slovnaft) Powerhouse, Slovakia, DCS upgrade 2007 - 2011
Upgrade of Powerhouse Foxboro I/A DCS. Upgrade included: architecture change (Nodebus/LAN architecture to MESH), operators' stations (13x AW51 to AW70), control processors (16x CP30/40/60 to 10x ZCP270) and communications (12x ABSTAT, ABGW, MODGW to FBM230/FBM231/FBM233).
Keadby Power Station, SSE, Great Britain 2007 - 2009
Foxboro I/A - FCP270, IACC, Infusion
Westinghouse to I/A DCS migration.
Control database configuration.
Slovnaft refinery, Powerhouse, Slovakia 2007
Rockwell Automation, Control Logix
TG2 PLC5 to CLX upgrade.
Application programming - Continuous Control, HMI, communication to Foxboro DCS, on-site startup assistance.
Powerhouse Košice, Slovakia 2005
Foxboro I/A - ABGW, AW51B, WP51D
Rockwell Automation, PLC5, Control Logix
Communication between boiler control system (Foxboro I/A) and electrical precipitators (CLX) via existing PLC5. Human-Machine Interface (HMI) done in boiler control system.
Slovnaft refinery, Powerhouse, Slovakia 2004
Foxboro I/A - AW51E, WP51B, CP40, ABSTAT
Rockwell Automation, PLC5 - RS Logic
Intergration of TG3 control into Powerhouse control system. Analog inputs/outputs controlled by Foxboro I/A, motor control by Allen Bradley PLC5.
Control design and implementation, HMI and startup.
Slovnaft refinery, Powerhouse, Slovakia 2003 - 2004
Foxboro I/A - AW51E, WP51B, CP40, MODGW
Revamp of TG2 hydraulic actuator control done by replacement of Simatic trip system with Woodward Micronet governor and trip system.
Control design and implementation, HMI, communication with Woodward governor and startup (Foxboro I/A). Field instrumentation delivery and instalation, project delivered as subcontract from company PPA Engineering Ltd.
Slovnaft refinery, Powerhouse, Slovakia 2003 - 2004
Foxboro I/A - AW51E, WP51B, CP40, ABSTAT
Rockwell Automation, PLC5 - RS Logic
Electrofeeding pumps EN1, EN3, EN5, EN6, EN8, EN9 a EN10 control done by Allen Bradley PLC5 backup processors. Ladder logic configuration, HMI done in Powerhouse control system (Foxboro I/A), communication with Foxboro I/A, startup.
Slovnaft refinery, Powerhouse, Slovakia 2003
Foxboro I/A - AW51E, WP51B, CP40, MODGW
TG1 control, HMI, communication to turbine governor Woodward and Simatic trip system modification due to general repair done by ALSTOM POWER
Slovnaft refinery, Powerhouse, Slovakia 2003
Foxboro I/A - AW51E, WP51B, CP40, MODGW
Rockwell Automation, PLC5 - RS Logic
HIMA
Modification of combustion parameters (lambda, I) in Foxboro I/A control system and Burner management system according instructions of burners´ manufacturer - M&S for boilers K1, K2, K3, K7 and K8.
BEWAG, Berlín, Germany 2001 - 2003
Foxboro I/A - AW51E, WP70, CP40, FoxCAE/COMOS
Control loops basic design, HMI configuration for 300MW unit D of powerplant Reuter West.
Slovnaft refinery, Powerhouse, Slovakia 2000 - 2001
Foxboro I/A - AW51E, WP51B, CP40, MODGW
Revamp of TG4 hydraulic actuator control done by instalation of Woodward WW505E and Simatic trip system. Control design and implementation, HMI, communication with Woodward governor and Simatic trip system, startup (Foxboro I/A). Field instrumentation delivery and instalation, project delivered as subcontract from company PPA Engineering Ltd.
1.SZ Teplárenská a.s., Komořany, Czech republic 1997 - 2000
Foxboro I/A - AW51B, CP40
Delivery of control system for 4 fluid bed boilers (150t/h of steam) K7-10 at powerplant Komořany.
Control design and implementation, HMI, startup.
ČEZ, Powerplant Chvaletice, Czech republic 1996 - 1999
Foxboro I/A - AW51B, WP51B, CP40
Instalation of control and trip system of 3 200MW units B2-B4 at powerplant Chvaletice in cooperation with The Foxboro Company and company Babcock & Wilcox.
Control design and implementation, HMI, startup of coal/oil boiler, electro feed pumps, turbofeed pumps and turbine. In addition to basic activities some special tasks have been completed with this project - boiler and turbine trip system configuration, turbine primary control programming, 1 ms tesolution alarming.